Top Stories

Grid List

Ship Stability - Curves of Statical Stability

Load Line requirements for minimum stability conditions

Ship Stability - Movement of the Centre of Gravity

Centre of gravity

THE GZ CURVE OR CURVE OF STATICAL STABILITY A typical plot of GZ against angle of heel is shown here.

Remember that the evidence relating to the incident is likely to be found on board the ship and that this evidence will be needed by the Club to defend claims which are received from injured persons, the owners of damaged cargo or property, or from a terminal operator.

Handling characteristics will vary from ship type to ship type and from ship to ship. Handling qualities are determined by ship design, which in turn depends on the ship’s intended function. Typically, design ratios, such as a ship’s length to its beam, determine its willingness to turn.

You can use this Draught Survey program for free. It has no passwords. This program has been used for many years.

Where the authorized officer so directs, or where the master is required to make a report under Regulation 13 (see Preparations for health clearance in Section H), no person other than the pilot, a customs officer, or an immigration officer, may, without the permission of the authorized officer, board or leave a ship until free pratique has been granted, and the master must take all reasonable steps to secure compliance with this requirement.

The average adjuster appointed by the party who declared general average (which is most often the ship owner).

Timesheets and Laytime calculation. After a fixture has been made and the vessel has commenced performance of the charter, "post-fixture activities" become important.

 

LETTER OF PROTEST

Note: Content was contributed by our readers. 

INDEX of NOTES of PROTEST

Ref # SUBJECT

Cancelling date (Laycan). This is an abbreviation for the "Laydays and Cancelling" clause in a charterparty. This clause establishes the earliest date, when the ship is required by the charterer, (e.g. "Laytime for loading shall not commence before . . .") and the latest date for the commencement of the charter (e.g. “ . . . and should the vessel's Notice of Readiness not be given before . . . ") when the charterers have the option of cancelling the charter.

Advertisement
Advertisement