in

What does MGN 331 recommend concerning inspection of work equipment?

It contains a strong recommendation that the maximum interval between inspections should be 5 years for work equipment, or a shorter period if recommended by the manufacturer.

What do you think?

138 Points
Upvote Downvote

Written by Ship Inspection

Leave a Reply

What does MGN 331 recommend regarding the regular examinations of work equipment?

When complying with PUWER, which other health and safety regulations must an employer (and master) have regard to?