in

What information is required on the Waste Notification form in Schedule 2 of the Port Waste Regulations?

Ship’s name; call sign; IMO number; flag state; 

ETA; ETD; previous port or terminal; next port or terminal; last port or terminal and date when ship- generated waste was delivered; are you delivering all/some/none of your waste into port reception facilities?; type and amount of waste and residues to be delivered and/or remaining on board, and percentage of maximum storage capacity, categorised into: (1) Waste oils; (2) Garbage; (3) Cargo-associated waste; and (4) Cargo residues; master’s signed statement that there is sufficient dedicated on-board capacity to store all waste generated between notification and next port or terminal at which waste will be delivered.

 

What do you think?

138 Points
Upvote Downvote

Written by Ship Inspection

Leave a Reply

At what time must a UK harbour authority be notified of ship-generated waste to be landed by a ship?

A ship has on board ship-generated waste of various kinds for landing at a UK port. What action must be taken before landing it?