in

To ensure maintenance of the Conditions of Assignment after survey, what is not allowed?

After any load line survey has been completed, no change is allowed to be made in the structure, equipment, arrangements, material or scantlings covered by the survey, without the sanction of the flag State Administration.

Share this:

Written by Ship Inspection

Leave a Reply

    How should preparations be made for a load line survey?

    Who issues the Record of Conditions of Assignment?