in

How should likelihood (or probability) be rated on a risk assessment summary sheet?

As either “highly unlikely”, “unlikely” or “likely”. (These should form the headings for each horizontal line. )

Share this:

Written by Ship Inspection

Leave a Reply

    How should risk tolerability be rated on a risk assessment summary sheet?

    What does “extremely harmful” mean?