in

What surveys are required for an International Load Line Certificate?

(1) An initial survey before the ship is put in service; (2) a renewal survey at intervals not exceeding 5 years; and (3) an annual survey within 3 months before or after each anniversary date of the certificate.

Share this:

Written by Ship Inspection

Leave a Reply

    What does an International Load Line Certificate certify?

    Is the ILLC in the Harmonized System of Survey and Certification?