What are the SOLAS requirements relating to the design and construction of emergency towing arrangements on tankers constructed on or after 1 July 2002?

For tankers constructed on or after 1 July 2002 the arrangements must, at all times, be capable of rapid deployment in the absence of main power on the ship to be towed and easy connection to the towing ship.Β 

At least one of the emergency towing arrangements must be pre-rigged ready for rapid deployment. Emergency towing arrangements at both ends must be of adequate strength taking into account the size andΒ dead-weightΒ of the ship, and the expected forces during bad weather conditions. The design and construction and prototypeΒ testing of emergency towing arrangements must be approved by the flag State Administration, based on IMO Guidelines.

Β 

Share this:

Written by Ship Inspection

Leave a Reply

What are the SOLAS requirements relating to the design and construction of. emergency towing arrangements on tankers constructed before 1 July 2002?

What are the SOLAS requirements relating to the fitting of emergency towing arrangements on tankers?