in

What statements on the International Anti- Fouling System Certificate have to be completed by the surveyor?

(1) An anti-fouling system controlled under Annex 1 has not been applied during or after construction of this ship.Β 

(2) An anti-fouling system controlled under Annex 1 has been applied on this ship previously, but has been removed by (insert name of the facility) on (date) (3) An anti-fouling system controlled under Annex 1 has been applied on this ship previously, but has been covered with a sealer coat applied by (insert name of the facility) on (date) (4) An anti- fouling system controlled under Annex 1 was applied on this ship prior to (date), but must be removed or covered with a sealer coat prior to (date)

Β 

Share this:

Written by Ship Inspection

Leave a Reply

What document must be attached to an International Anti- Fouling System Certificate?

When does an International Anti- Fouling System Certificate cease to be valid?