in

What surveys are required for the International Sewage Pollution Prevention Certificate?

(1) An initial survey before the ship is put in service or before the ISPPC is first issued; (2) a renewal survey at intervals of not more than 5 years; and (3) an additional survey, either general or partial, according to the circumstances, after a repair resulting from an investigation or whenever any important repairs or renewals are made.

Share this:

Written by Ship Inspection

Leave a Reply

    What is the maximum period of validity of an International Sewage Pollution Prevention Certificate?

    Is the ISPPC in the Harmonized System of Survey and Certification (HSSC)?