in

A ship has on board ship-generated waste of various kinds for landing at a UK port. What action must be taken before landing it?

The master of a ship bound for a port or terminal must complete the notification form in Schedule 2 of the Regulations (also found at Annex A of MGN 387), and must give the information to the harbour authority before entry of the ship.

Share this:

Written by Ship Inspection

Leave a Reply

    What information is required on the Waste Notification form in Schedule 2 of the Port Waste Regulations?

    Which UK merchant ships do the Port Waste Regulations not apply to, and how should these ships handle their ship-generated waste?