in

What information is required on the Waste Notification form in Schedule 2 of the Port Waste Regulations?

Ship’s name; call sign; IMO number; flag state;Β 

ETA; ETD; previous port or terminal; next port or terminal; last port or terminal and date when ship- generated waste was delivered; are you delivering all/some/none of your waste into port reception facilities?; type and amount of waste and residues to be delivered and/or remaining on board, and percentage of maximum storage capacity, categorised into: (1) Waste oils; (2) Garbage; (3) Cargo-associated waste; and (4) Cargo residues; master’s signed statement that there is sufficient dedicated on-board capacity to store all waste generated between notification and next port or terminal at which waste will be delivered.

Β 

Share this:

Written by Ship Inspection

Leave a Reply

At what time must a UK harbour authority be notified of ship-generated waste to be landed by a ship?

A ship has on board ship-generated waste of various kinds for landing at a UK port. What action must be taken before landing it?