On the left side of the load line “stem” there is a letter “H” level with the load line through the ring, and at the level of the design waterline. This may be the only assigned load line, but there may also be an “F” line for fresh water.
Don't have an account? Register
Enter your account data and we will send you a link to reset your password.
To use social login you have to agree with the storage and handling of your data by this website. %privacy_policy%
AcceptHere you'll find all collections you've created before.