in

What does “ready to load” mean (the second prerequisite for laytime to commence)?

Ready both physically and legally, i. e. with hatches prepared for receiving the cargo, the vessel cleared customs and other formalities, any required survey carried out and passed.

Share this:

Written by Ship Inspection

Leave a Reply

    How can owners ensure that charterers will not obstruct the commencement of laytime by preventing a vessel from reaching the loading berth?

    How can a master determine whether his ship is an “arrived ship”?