in

What is the MCA’s principal condition of its acceptance of any proposed in-water survey?

That a survey in dry dock is to be arranged if the in-water survey is not to the surveyor’s satisfaction.

Share this:

Written by Ship Inspection

Leave a Reply

What is the Alternative Compliance Scheme?

To whom must application be made for in-water survey of a UK ship?